一 052010
Tcode:MMAM
- Material type can be changed if no stocks, reservation, or purchasing documents exist.
- If stock, reservation, or purchasing order exists, the material type can be changed if:
i. the same GL account is updated by the old material type
ii. quantities and values are updated as they were by the old material type